Double-deck structural concept with 13 meter tray width, 12 meter height and total length of 2,280 meters. This stunning structure carries the highway on the upper level and the railway below. Steel truss work with a cable-stayed main span of 360 meters and a succession of 120 meter lateral spans.
View the embedded image gallery online at:
http://figueiredoferraz.com.br/en/projects/transports/bridges-and-viaducts/item/268-third-road-and-rail-bridge-over-the-orinoco-river-venezuela#sigProGalleria37764a88a7
http://figueiredoferraz.com.br/en/projects/transports/bridges-and-viaducts/item/268-third-road-and-rail-bridge-over-the-orinoco-river-venezuela#sigProGalleria37764a88a7