1961 through 1963 - pre-stressed concrete slabs suspended using the Ferraz Process; 74 meter clear span of 2.100 m² area. A landmark in Brazilian engineering, unsurpassed at the time.
1997 - Projects and construction management for remodeling and recovery of the building. Architecture by Lina Bo Bardi.
View the embedded image gallery online at:
http://figueiredoferraz.com.br/en/projects/buildings/item/295-masp-sao-paulo-art-museum#sigProGalleriae51c49bea1
http://figueiredoferraz.com.br/en/projects/buildings/item/295-masp-sao-paulo-art-museum#sigProGalleriae51c49bea1